Lab

Home / Lab (Page 2)

In collaboration with the Kent State University EHHS/School of Foundations, Leadership & Administration and Public Health, the ATR Lab conducted the first test study for the Virtual Reality Student Recreation and Wellness Center Tour. The study was conducted as a test for our tour system that is aimed at providing a wide variety of people, especially a physically or intellectually disabled individuals, the capability to explore locations they might not normally have easy...

Attendees: Kim, Jong-Hoon Kim, Do Yeon Kanyok, Nate Shaker, Alfred Richarson, Kody Lee, Suho Kim, Sung Kwan Baza, Ahmed   Agenda: 1. Administration works 2. Events 3. Conferences 4. WRS 5. ATR website 6. VR-TR demo 7. Present weekly reports   Summary: 1. Administration works 1.1. Guidelines 2. Events 2.1. Inauguration day * Due: 2018-10-05 2.2. 3. Conferences 4. WRS 4.1. Fundraising * Due: 2018-08-14 4.2. Manufacturing 4.3. ROS tutorial * Due: 5. ATR website 5.1. Give brief description of each team 5.2. A table for WRS team organization 6. VR-TR demo * Due: 2018-08-13 7. Present weekly reports...

Attendees: Kim, Jong-Hoon Kim, Do Yeon Cardenas, Irvin Kanyok, Nate Shaker, Alfred Richarson, Kody Lee, Suho Kim, Sung Kwan Baza, Ahmed Kim, Gaeun   Agenda: 1. Lab administration works 2. Lab events 3. Present weekly report   Summary: 1. Lab administration works 1.1. Rental rules 1.2. Robotics kit for class 1.3. Website 2. Lab events 2.1. Survey for the VR & TR team 2.1.1. From the ATR lab members 2.1.2. From the NIH project team members 2.2. TeleBot-2 manufacturing 2.2.1. Design 2.2.2. Manufacture date: 2018-08-07 2.3. Fundraising with Dr. Khan (refer to agenda_alevina) 2.4. Seminar in the morning (10:00 AM) on...

Attendees: Kim, Jong-Hoon Kim, Do Yeon Cardenas, Irvin Kanyok, Nate Shaker, Alfred Lin, XiangXu Richarson, Kody Lee, Suho Kim, Sung Kwan Baza, Ahmed Kim, Gaeun   Agenda: 1. Weekly schedule 2. ATR Guidelines 3. WRS 4. Present weekly reports 5. Abstract for Sprint Robotics Conference   Summary: 1. Weekly schedule 1.1. Building a prototype of TeleBot2 starting on 2018-08-01 1.2. Picking up tools on 2018-08-01 2. ATR guidelines 2.1. GitHub: Refer to guidelines on 'develop' branch in 'dev-guidelines' 2.1.1. Link: https://github.com/ATR-Lab/dev-guidelines/tree/develop 3. WRS 3.1. Two pairs of operators 3.1.1. Tutorials about ROS and operation-related 3.2. Questions 3.2.1. Indoor or outdoor 3.2.2. Purpose of...