Smart Tablebot Blog

Home / Smart Tablebot Blog (Page 5)

Attendees: Kim, Jong-Hoon Kim, Do Yeon Cardenas, Irvin Kanyok, Nate Shaker, Alfred Lin, XiangXu Shawn Jung, Hyun Jae Lee, Suho Baza, Ahmed   Agenda: 1. Preparation for the Fall semester 2. Present weekly reports 3. WRS 4. Fundraising 5. Design   Summary: 1. Preparation for the Fall semester 1.1. Sharing schedule with atrlab.kent@gmail.com 1.2. General meeting: Every two weeks 1.3. Team meeting 1.4. Recruitment for new students 2. Present weekly reports 2.1. A survey for VR-TR team 2.1.1. Second subject test * Due: 2018-08-28 2.2. Motion tracking * Due: 2018-08-26 2.3. Localization 3. WRS 3.1. Manufacturing 3.1.1. Order list 3.2. Team intro video * Due:...

In collaboration with the Kent State University EHHS/School of Foundations, Leadership & Administration and Public Health, the ATR Lab conducted the first test study for the Virtual Reality Student Recreation and Wellness Center Tour. The study was conducted as a test for our tour system that is aimed at providing a wide variety of people, especially a physically or intellectually disabled individuals, the capability to explore locations they might not normally have easy...

Attendees: Kim, Jong-Hoon Kim, Do Yeon Kanyok, Nate Shaker, Alfred Richarson, Kody Lee, Suho Kim, Sung Kwan Baza, Ahmed   Agenda: 1. Administration works 2. Events 3. Conferences 4. WRS 5. ATR website 6. VR-TR demo 7. Present weekly reports   Summary: 1. Administration works 1.1. Guidelines 2. Events 2.1. Inauguration day * Due: 2018-10-05 2.2. 3. Conferences 4. WRS 4.1. Fundraising * Due: 2018-08-14 4.2. Manufacturing 4.3. ROS tutorial * Due: 5. ATR website 5.1. Give brief description of each team 5.2. A table for WRS team organization 6. VR-TR demo * Due: 2018-08-13 7. Present weekly reports...

Attendees: Kim, Jong-Hoon Kim, Do Yeon Cardenas, Irvin Kanyok, Nate Shaker, Alfred Richarson, Kody Lee, Suho Kim, Sung Kwan Baza, Ahmed Kim, Gaeun   Agenda: 1. Lab administration works 2. Lab events 3. Present weekly report   Summary: 1. Lab administration works 1.1. Rental rules 1.2. Robotics kit for class 1.3. Website 2. Lab events 2.1. Survey for the VR & TR team 2.1.1. From the ATR lab members 2.1.2. From the NIH project team members 2.2. TeleBot-2 manufacturing 2.2.1. Design 2.2.2. Manufacture date: 2018-08-07 2.3. Fundraising with Dr. Khan (refer to agenda_alevina) 2.4. Seminar in the morning (10:00 AM) on...